The Headland Residences (海德園) at 99 Sheung On Street, Chai Wan, is a Swire Properties and China Motor Bus joint development on the former CMB depot site. Phase 1 offers 592 units across two towers, with the material date set for 31 August 2026 — meaning most owners will take possession between September and November 2026. Unit mix is dominated by 2-bedroom layouts (362 units, mainly 573 sqft show-flat type), followed by 140 three-bedroom-plus-ensuite units and 70 one-bedroom units. The development sits 7-10 minutes’ walk from Chai Wan MTR station, is served by 40+ bus and minibus routes, and falls within the desirable Eastern District secondary school net and Primary School Net 16.
This article from ACDesign (Art Creation Interior Design) dissects two flagship case-study templates: a 573-sqft two-bedroom warm-minimalist scheme (HK$58-68k budget, 75-90 working days) and an 815-sqft three-bedroom modern-simple family scheme (HK$82-95k budget, 95-110 working days). We cover the five common design pillars — living room TV wall, open-plan kitchen with island, master bedroom workstation, child-friendly storage, and concealed entryway shoe cabinets — alongside floor-plan analysis, pre/post comparisons, and homeowner feedback. With Phase 1 completion approaching, owners are advised to secure designers 8-10 weeks before handover to avoid the new-launch peak-season scheduling bottleneck. Visit our completed works portfolio or book a free consultation for your Headland Residences floor plan today.